BS 7671 Amendment 4 and what the 15th October change means for UK businesses
29 / 09 / 2026
BS 7671 Amendment 4
The “Orange Book” is about to change. From 15th October 2026, BS 7671:2018+A4:2026 becomes the current edition of the IET Wiring Regulations, bringing with it significant changes to the way electrical installations are designed, installed, inspected and maintained. For businesses, the implications go well beyond keeping up with a revised standard, particularly as battery storage, solar PV, EV charging and sophisticated digital systems become part of the modern building, writes Phil Wiltshire, Contracts Manager at Pensdown, the electrical people.
BS 7671 is the UK’s national standard for electrical installations, covering domestic, commercial and industrial environments. Known throughout the industry as the “Orange Book” because of its distinctive cover, it provides the technical framework for the design, installation, certification, inspection and maintenance of electrical systems. Amendment 4 represents a major update to that framework and with the transition period ending on 15th October, businesses need to understand what is changing and where it could affect their electrical infrastructure.
Amendment 4:2026 was published on the 15th April 2026 and can already be adopted. There is, however, a six-month transition period. Until 15th October 2026, both BS 7671:2018+A2:2022+A3:2024 and the new BS 7671:2018+A4:2026 remain current. From 15th October, however, Amendment 3 is withdrawn and Amendment 4 becomes the current edition.
For businesses planning electrical work, that date matters. The changes reflect how quickly electrical installations have evolved, with buildings increasingly incorporating on-site generation, battery storage, EV charging, ICT infrastructure and increasingly sophisticated control systems.
The question for businesses is therefore less about a new book appearing and more about what the revised requirements mean for projects already being designed, existing electrical infrastructure and future investment.
Why Amendment 4 matters
BS 7671 is not legislation in itself. It is the recognised technical standard for electrical installations and provides the framework against which electrical work is designed, installed, inspected and tested.
That distinction is important because compliance is rarely considered in isolation. Specifications, certification requirements, competent-person schemes, insurers, facilities management procedures and client requirements can all reference the current edition of BS 7671.
NICEIC has confirmed that from 15th October 2026 new electrical work should conform to Amendment 4 and that its certified businesses will need access to the current edition to maintain scheme compliance.
The transition also needs to be understood correctly. Electrical work designed for Amendment 3 before 15th October can still be completed to that design after the withdrawal date. However, the client should understand that the design is based on a withdrawn standard, while contractual requirements, insurers or other third parties may require the latest edition. For projects currently at the design stage, this makes the choice of standard an important consideration now, rather than something to address when installation begins.
Battery storage gets its own chapter
One of the most significant developments in Amendment 4 is the introduction of Chapter 57 – Stationary Secondary Batteries. The change reflects the growing use of battery energy storage systems within electrical installations. Businesses are increasingly combining solar PV, battery storage, grid supply, EV charging and energy management as part of broader energy strategies.
Chapter 57 establishes dedicated requirements for stationary secondary batteries where their purpose is the storage and supply of electrical energy to installations. It covers areas including selection and erection, protection against electric shock, protection against thermal effects and other hazards, isolation and switching, identification and verification. This is significant because battery storage introduces characteristics that differ from conventional loads.
A battery can store substantial electrical energy and subsequently return that energy to an installation. It therefore has implications for protection, isolation, fault conditions and the way the wider installation is configured.
For businesses considering battery storage, the electrical design cannot be separated from the characteristics and location of the battery system. The system needs to be considered as part of the installation from the design stage. That becomes particularly relevant where batteries are being integrated with solar PV or other generation.
Solar PV
Solar PV is already covered by BS 7671, so Amendment 4 does not represent the introduction of PV requirements from scratch. The more important issue is how PV increasingly operates alongside other technologies.
A commercial building may have a grid connection, rooftop PV, battery storage, EV charging infrastructure and automated energy management. Electricity can move in different directions depending on generation, demand, storage state and control strategy.
Amendment 4 includes changes affecting generating sets operating in parallel with other sources and addresses situations involving bidirectional energy flow. It also recognises stationary batteries as generating sets rather than loads in relevant arrangements.
That has implications for the selection and coordination of protective devices and for the way electrical systems are assessed as a whole. For businesses, this reinforces the need for electrical design to consider the complete energy architecture rather than treating PV, storage and charging infrastructure as separate additions.
EV charging becomes part of a wider electrical strategy
EV charging has become a significant electrical load in commercial premises, particularly where businesses are providing workplace charging, fleet infrastructure or charging facilities for customers and visitors.
Amendment 4 introduces changes to the requirements for EV charging installations, including the introduction of RDC protective devices within the relevant requirements. NICEIC identifies this as one of the specific technical changes covered by Amendment 4.
This means that the technical implications extend beyond the charger itself. The designer now needs to consider the earthing arrangement, protective measures, charging equipment characteristics, load management and the effect of multiple vehicles charging simultaneously.
The issue becomes more complex when EV charging is combined with PV and battery storage. A business may have generation during daylight hours, storage capacity, several high-demand EV chargers and a finite grid connection. The electrical infrastructure has to accommodate those competing demands while maintaining appropriate protection. That makes early assessment of available capacity increasingly important.
Earthing: a more detailed picture
Amendment 4 also introduces changes around earthing, including the recognition of Protective Neutral Bonding (PNB) within BS 7671. NICEIC notes that PNB is now recognised within the Wiring Regulations and that the new edition allows PNB to be selected as an earthing arrangement on relevant certification.
There is also a new Section 545, covering functional earthing and functional equipotential bonding for information and communication technology equipment and systems. This is an important distinction for modern commercial buildings.
Protective earthing has a fundamental safety function. Functional earthing, meanwhile, can be necessary for the correct operation of equipment and systems. With buildings increasingly dependent on ICT, communications, data and digitally controlled services, those requirements can become an integral part of electrical design.
Amendment 4 provides a dedicated framework for functional earthing and bonding in ICT environments rather than leaving the subject within the wider context of electrical installation design.
For buildings with substantial data, communications or control infrastructure, this is an area that deserves attention during design rather than being resolved after other services have been installed.
Another new area is Power over Ethernet (PoE). PoE allows power to be delivered alongside data through Ethernet cabling and is increasingly used for devices including lighting, cameras, access-control equipment and sensors. Amendment 4 introduces a new section dealing with PoE. This is another indication of how the boundaries between electrical, communications and building technology systems are changing.
For commercial fit-outs, a PoE installation may form part of a much wider building infrastructure involving IT networks, lighting controls, security, access control and building management systems. The electrical design therefore needs to account for the characteristics of the system and the relationship between the PoE infrastructure and other electrical services.
Healthcare installations see major changes
Amendment 4 also contains a major revision to Section 710 – Medical Locations. The changes include revised requirements around medical locations and the inclusion of a schedule of test results for recording the resistance of supplementary protective equipotential bonding conductors.
For contractors working in healthcare environments, this is an important development because electrical resilience, protective measures and verification requirements are particularly significant where electrical systems support clinical activity.
It also illustrates why Amendment 4 should not be viewed as a document concerned only with emerging energy technologies. The amendment contains changes across the wider electrical installation framework.
These implications also continue after installation. Part 6 has been revised, with changes affecting inspection and testing, EICRs and the Model Forms contained within Appendix 6. NICEIC's technical guidance specifically highlights the changes to testing and inspection and the associated certification documentation. This matters for businesses with substantial property portfolios.
An electrical installation does not become compliant because it was designed correctly. It needs to be installed correctly, verified and appropriately documented. As the standard changes, the processes used by electrical contractors and those responsible for inspecting installations also need to change.
NICEIC has confirmed that from 15th October 2026 only Amendment 4 forms will be available through its certification system, although existing open Amendment 3 forms can be completed until 15 April 2027.
For facilities managers and building owners, this makes it worth checking how electrical records are maintained across an estate and whether contractors are using the appropriate documentation for the standard to which the work has been designed.
What does the change mean for businesses?
The immediate question for any business with electrical work planned is - which version of BS 7671 is the project being designed to? For projects still at an early design stage, there is a strong case for assessing the implications of Amendment 4 now rather than designing to a standard that will be withdrawn within weeks.
Projects already designed to Amendment 3 before 15th October can continue to be completed to that design. However, NICEIC recommends discussing the position with clients where work will be completed after the withdrawal date, particularly where contracts specify the latest edition or where insurers or other authorities may have their own requirements.
Businesses should also look beyond individual projects. A review of existing electrical infrastructure may identify planned requirements for:
• battery energy storage;
• solar PV;
• EV charging;
• additional electrical capacity;
• ICT and PoE systems;
• changes to earthing arrangements;
• healthcare or specialist installations; and
• future expansion of electrical loads.
These systems increasingly interact with each other. A decision to install EV charging, for example, can have consequences for available electrical capacity. Adding battery storage can change the characteristics of the installation. PV introduces generation, while ICT infrastructure creates its own requirements around functional earthing and bonding. The earlier those relationships are considered, the greater the opportunity to incorporate them into the overall design.
What should businesses do before 15th October?
There is no reason to wait for the transition date. Businesses planning electrical work should establish which edition is currently being used for each project and whether Amendment 4 changes any design assumptions.
For new projects, it is worth considering Amendment 4 during the specification and design process, particularly where the project includes battery storage, PV, EV charging, PoE, ICT infrastructure or specialist environments.
Existing installations should also be considered in the context of future modifications. A building may have been designed around a conventional electrical load, but subsequent additions can significantly alter the installation's requirements.
The quality of the existing information is important here. Electrical drawings, distribution schedules, previous inspection reports, certificates and records of modifications all provide useful information when assessing what can be added and how it should be protected.
For us at Pensdown, the arrival of Amendment 4 reinforces an approach that has always been important in commercial electrical work – and that is to understand the building and its electrical infrastructure before deciding what needs to be installed. The contractor's role increasingly involves coordinating technologies that were once treated as separate disciplines.
An EV charger can be part of a wider energy strategy. Solar PV can interact with battery storage. ICT infrastructure can have implications for earthing and bonding. Electrical distribution has to accommodate increasingly sophisticated control systems. That means design, installation, testing and certification need to be considered as connected stages rather than isolated tasks. For businesses planning electrical upgrades, the useful conversation is therefore likely to start well before equipment is ordered.
A change driven by the way buildings now use electricity
Amendment 4 is a substantial update to BS 7671, but its significance is easier to understand when viewed against the changing role of electrical infrastructure within buildings.
Electricity is no longer being used solely to provide lighting and power to conventional equipment. Buildings are generating electricity, storing it, distributing it to vehicles, using it to operate digital systems and increasingly controlling those processes automatically. The Wiring Regulations have to respond to that environment.
This is therefore more than a changeover date. It is the point at which the updated requirements become the current technical reference for electrical installation work in the UK. For businesses, the priority should be to understand where those requirements affect their projects, buildings and future plans and make sure design, installation, inspection and certification are aligned accordingly.
Other News And Blogs
Pensdown officially appointed as an OZEV installer
Pensdown, the electrical people, has achieved another significant milestone. The company is now an Office for Zero Emission Vehicles (OZEV) approved...
Are solar panels a smart investment for your business?
In a time of volatile energy prices and increasing pressure to meet sustainability goals, businesses across the UK are looking for ways to take...
Accreditations and Awards